SYSTEMS/PROJECT ENGINEER 2015-03-01T18:46:37+00:00

Join a team that designs computers, displays, and electronic systems for aircraft of the present and future!  At Astronautics, you’ll be part of a creative group of professionals who work on the cutting-edge of technology.  Astronautics offers excellent pay, benefits and an opportunity for professional growth.

Job #:  1114331201

SYSTEMS/PROJECT ENGINEER

 

Responsibilities:

  • Driving systems engineering processes, methodologies and tools to the design of systems and new product development within the project team.
  • Performing customer requirements capture, analysis and test of avionics systems comprised of software, electronic, and mechanical subsystems and components.
  • Developing product architecture (systems, software, hardware), including assessing feasibility and technical risk.
  • Preparing and reviewing systems documentation, including requirement, design, interface, and verification documents.
  • Performing validation of requirements across multiple tiers of customer and system requirements.
  • Allocating system-level requirements to and coordinating development with subsystem design teams (software, hardware, mechanical).
  • Defining and authoring test plans and procedures and performing formal requirement verification.
  • Driving the integration and test of the system in a laboratory environment both at Astronautics and at the customer’s location.
  • Preparing statements of work for and supporting technical management of engineering activities.
  • Performing System Safety Assessments for high reliability systems in accordance with ARP 4761.
  • Directly support business development activities, including: bids, proposals, cost estimates, and aircraft surveys.
  • Leading technical coordination with customers.
  • Lead technical team in support of Business Development to develop proposal for capture of future projects.

Qualifications:

  • BS or MS degree in Engineering, Mathematics, Physical Sciences, or Computer Science required.
  • 6+ years Systems Engineering experience required, must also have strong project leadership experience.
  • Proficiency in the use of MS Word and Excel required; proficiency in the use of scheduling tools (e.g.: MS Project) preferred.
  • Experience using requirements management (e.g.: DOORS) and version control systems required.
  • Must have excellent communication, analytical, organizational and problem solving skills.
  • Must have experience in preparing, developing, and tracing system requirement specifications.
  • Knowledge about the operation and design of aircraft subsystems and auto-pilot instruments is a plus.
  • Knowledge of operating system architectural concepts in Linux or Real Time Operating Systems is a plus.
  • Experience with Avionics, Flight Control and Flight Management Systems, Aerospace, or Military systems design preferred.
  • Familiarity with military and FAA regulations and certification requirements for complex avionics equipment, as well as working knowledge of ARP 4754A preferred.

To apply, please submit a resume (by mail, email, or fax) to the address listed below:

ASTRONAUTICS CORPORATION OF AMERICA
9201 N 25th Ave Suite 150
Phoenix, AZ 85021
414-449-4009
Equal Opportunity Employer
Contact 1.414.449.4000